Cost
Custom engineering, redundant conversion stages, and site-by-site integration inflate project budgets before construction even begins.
We’ve optimized distributed generation, but not distributed deployment.
Energy tech has matured, but bringing it online still costs too much, takes too long, and demands too much complexity.


Time
Permitting, studies, and redesigns stretch simple installations into multi-year efforts. Speed isn’t limited by technology. It’s limited by process.
Complexity
Every added asset (solar, storage, EVs) increases the number of vendors, protocols, and control layers. Resilience becomes harder, not easier.
+40%
of total project costs are “soft costs” including permitting, engineering, and integration work that eats away ROI.
1-2 years
even small distributed projects face multi-year interconnection and study timelines.
70%
of project delays stem from coordination and technical integration issues, not equipment or construction.