Cost

Custom engineering, redundant conversion stages, and site-by-site integration inflate project budgets before construction even begins.

We’ve optimized distributed generation, but not distributed deployment.

 Energy tech has matured, but bringing it online still costs too much, takes too long, and demands too much complexity.

Power Pole Repair
bessai.png

Time

Permitting, studies, and redesigns stretch simple installations into multi-year efforts. Speed isn’t limited by technology. It’s limited by process.

Complexity

Every added asset (solar, storage, EVs) increases the number of vendors, protocols, and control layers. Resilience becomes harder, not easier.

+40%

of total project costs are “soft costs” including permitting, engineering, and integration work that eats away ROI.

1-2 years

even small distributed projects face multi-year interconnection and study timelines.

70%

of project delays stem from coordination and technical integration issues, not equipment or construction.

The Outcome: We’ve made clean energy affordable,
just not deployable.

Distributed Energy was meant to accelerate the transition. Instead, integration bottlenecks stall momentum and inflate costs.